Construction challenge (Step 3)

  1. Lots of fun was had as the children in the junior room worked in their teams to try to win the lollipop stick construction challenge. Each group had to build the tallest construction possible, that was stable enough to stand for at least 10 seconds using a maximum of 20 pegs and 20 lollipop sticks. There were wonderful ideas presented and great team work evident all round!

Print Friendly, PDF & Email

Leave a Reply

Your email address will not be published. Required fields are marked *